HomeProjectsMiami Ice, Expansion Joint Sealing

Miami Ice, Expansion Joint Sealing

Failing, water-filled expansion joints cut out and rebuilt with a premium Tremco system and painted for coastal UV protection.

Request a quote
Project overview

The brief.

Failing, water-filled expansion joints cut out and rebuilt with a premium Tremco system and painted for coastal UV protection.

The building was suffering significant water leaks. Detailed visual and destructive testing of the expansion joints showed they'd been installed poorly and were failing. When we opened them up a lot were full of water, with incorrect backing rod and no sign of primer. In many places the sealant came out by hand and the joints were full of mould.

We rebuilt them with a premium system: Tremco closed-cell backing rod, 171 porous primer and Dymonic FC sealant, so the joints would last. Given how close the building is to the coast, we finished them with Dulux AcraShield paint to protect them in a very UV-damaging environment.

On site

The work up close.

The results

A track record you can stand on.

Leaks
Traced and stopped
Premium
Tremco system
UV
Protected finish

Let's talk about your building.

Tell us what you need accessed, inspected, repaired or maintained. We'll come back to you within 24 hours.

info@ropeaccess.com.au
Request a quote
We'll come back to you within 24 hours